ajnara sports city is on planning stage and construction is
going to start very soon. Buyers remain concerned about its
possession time. Possession time depends upon the construction speed
and completion of the project. Ajnara group always try to give
possession of its projects on time and in past have proved it in
several of its old projects. Let’s have an insight in construction
phases and process for developing at noida extension.
Ajnara group would first start excavation of the land and would
dig it out as per the master plan. After completing excavation
architects and civil engineers would prepare the bed of steel which
would be filled with concrete. This process is called raft casting
and is the base of foundation. This raft is most important part of
building as it helps buildings in resisting earthquake as well as
they bear the load of buildings.
The next stage would be of placing out the columns as per building
floor layout and individual flat layout. These columns spacing and
placement remain same up to top floor of the building. After casting
column the basement roof slab would be casted which would be used as
per the reserve space for covered car parking. Then the main floor
work starts. In ajnara sports city casting of every floor would take
twenty or more days. Completion of structure would be in twenty four
months. Construction of club house building, sports centre, swimming
pool, party hall and facilities area would start after completion of
structure of building. In conclusion the most important aspect of
construction for possession would be completed in initial two